EXCLUSIVE FORUM FOR MACHINE DISMANTLERS AND REPAIR PEOPLE   >   Gary Indiana   >   Heavy Machinery   >   Electrical   >   High Frequency Converters   >   MB3 industries bar puller, 1.5" shank, 2.75" capacity

MB3 industries bar puller, 1.5" shank, 2.75" capacity


MB3 Industries Bar Puller, 1.5" Shank, 2.75" Capacity
There are instructions on the side of the puller which read: Set Up - 1) Mount in holder and bring X axis on center if bar. 2) Bring puller to face of material with Z axis touching the face of material with button head screw. Be sure gripping screws are out of way. 3) Record Z zero 4) Move in Z axis - .500" 5) Adjust screws until touching O.D. of material. 6) After contact with material, tighten screws an additional 1/8 to 1/4 turn. 7) Move puller Z+ off material. 8) Return home, set up complete. Function - 1) Call puller and STOP spindle. 2) Rapid to center of X axis a safe distance in Z axis. 1.0" is good. 3) Rapid Z axis -.500" 4) Collet open. 5) Pull needed distance 6) Collet close. 7) Rapid Z axis off bar. Puller should snap open. 8) Return home.



MB3 industries bar puller, 1.5